{"id":2746,"date":"2026-10-23T06:19:02","date_gmt":"2026-10-23T06:19:02","guid":{"rendered":"https:\/\/www.cgxproducts.com\/?page_id=2746"},"modified":"2026-10-23T06:19:04","modified_gmt":"2026-10-23T06:19:04","slug":"environmental-report","status":"publish","type":"page","link":"https:\/\/www.cgxproducts.com\/index.php\/environmental-report\/","title":{"rendered":"ENVIRONMENTAL REPORT"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">LABORATORY DETAILS<br>Lab Name<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Elisra &#8211; Environmental Test Laboratory<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Address<br>4234 Monterey Rd Unit A, San Jose, CA 95111<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Tel.<br>(408) 884-5885<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">E-Mail<br><a href=\"mailto:customer@cgxproducts.com\">customer@cgxproducts.com<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">CUSTOMER DETAILS<br>Customer Name KENSUN<br>DOCUMENT CONTROL<br>This document is a controlled document. It is your responsibility to ensure that you have the appropriate version of this document. This document is not subject to version control when printed. This document was developed using version 2.01 of the iDDE-2000\/etr editing environment developed and supported by the corporate Software Engineering Department of the Quality Management Division. The format and contents of this document is in accordance with those provided by version 2.01 of the iDDE-2000\/etr environment.<br>DOCUMENT HISTORY<br>The following table records information regarding released editions of this document and briefly describes their file location,purpose and changes made to them.<br>Edition Id Release Date Responsible Author File Reference, Purpose and Description of Changes<br>&#8212; 20\/5\/2007 Guy Barkay File Reference: REPORTS\\kneson \\\u200ckensun-1704.\u200cdoc<br>Purpose:<br>Changes:<br>DOCUMENT APPROVALS<br>This edition has been approved by:<br>Name Title Signature Date<br>Author Guy Barkay Test Engineer Document approved by Guy Barkay May 20, 2007<br>Approved Dov Carmeli Lab Manager Document approved by Dov Carmeli May 20, 2007<br>DISTRIBUTION LIST<br><br>OPEN ISSUES<br>This part of the document control section is used to record and track open issues and\/or unresolved questions.As the developmentof this document proceeds, these issues and questions should be resolved and then removed from the list.<br>No. Subject\/Section Description<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">INTRODUCTION<br>1.1. PURPOSE<br>The purpose of this document is to verify that the HID CONVERSION KIT meet all requirements as per the applicable documents.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1.2. SCOPE<br>The scope of this Environmental Test Report includes the environmental test results as specified by the customer and by the related resources.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1.3. GLOSSARY<br>Abbreviation \/ Acronym \/ Term Explanation \/ Description<br>iDDE Integrated Document Development Environment<br>ID IDentifier<br>NA Not Applicable<br>TBD To Be Defined<br>ETR Environmental Test Report<br>ETS European Telecommunication Standard<br>IEC International Electronic Community<br>NC Not Controlled<br>UUT Unit Under Test<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1.4. APPLICABLE DOCUMENTS<br>This section contains a list of resources (e.g., documents, files, tools) referenced by or related to this document. All documents&#8217; revisions are the latest known on the date of the contract signing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">IEC-68<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">. BMW GROUP ELECTRICAL\/ELECTRONIC ASSEMBLIES IN MOTOR VEHICLES GENERAL INFORMATION. GS 95003-1 MARCH\/2000. SUPERSEDESRES 62.60013 PART 1, ISSUE 06.97. Elisra<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1.5. EXECUTIVE SUMMARY<br>The following table summarizes the tests that have been performed in Elisra &#8211; Environmental Test Laboratory.<br>KENSUN performed the functional tests and they are his sole responsibility<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No. Test Name Pass\/Fail<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Low Temperature Test Pass<\/li>\n\n\n\n<li>High Temperature Test Pass<\/li>\n\n\n\n<li>Random Vibration Test Pass<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Statement Of Compliance with test requirements.<br>We, Elisra &#8211; Environmental Test Laboratory, declare under our sole responsibility that the HID CONVERSION KIT were tested to comply with the requirements of the applicable environmental test specification.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">LOW TEMPERATURE TEST<br>UNIT UNDER TEST OVERVIEW<br>Test Date 13-14\/5\/07<br>Customer Representative Shmuel Etinger<br>Customer KENSUN<br>Unit Name HID CONVERSION KIT INCLUDES: H01 ELECTRONIC BALLAST 0902 ELECTRONIC BALLAST<br>XENON LIGHTBULB<br>Item Quantity 6<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">TECHNICAL SOURCE<br>. IEC-68-1 Test A : Cold.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">TEST INSTRUMENTATION &#8211; TEMPERATURE CHAMBER<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No. Manufacturer \/ Model Calibration Expired Date<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>THERMOTRON Model F-35 31\/10\/2007<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">TEST PROCEDURE<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">EXCLUSIONS FROM THE TEST METHOD<br>Not applicable<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">LOW TEMPERATURE TEST PROCEDURE DESCRIPTION<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Period 16 Hours<br>Temperature -40\u00b0C<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">TEST PERFORMANCE<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Functional Test Performed by laboratory during and at the end of test.<br>Visual Test Performed by laboratory during and at the end of test.<br>HID CONVERSION KIT LOCATED IN LOW TEMPERATURE CHAMBER<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">HID kit is in the low temperature chamber<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">HID Xenon kit in the low temperature chamber<br>TEST RESULTS<br>In visual inspection at completion of the test, no external damage observed. Operational and visual tests have been conducted by the customer representatives during and at the end of the test.Pass O.K.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">PRODUCT RESPONSE GRAPH<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">KENSUNPRODUCT RESPONSE GRAPH<br>HIGH TEMPERATURE TEST<br>UNIT UNDER TEST OVERVIEW<br>Test Date 14-15\/5\/07<br>Customer Representative Shmuel Etinger<br>Customer KENSUN<br>Unit Name HID CONVERSION KIT INCLUDES: H01 ELECTRONIC BALLAST 0902 ELECTRONIC BALLAST<br>XENON LIGHTBULB<br>Item Quantity 6<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">TECHNICAL SOURCE<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">. IEC-68-2 Test B : Dry heat.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3.3. TEST INSTRUMENTATION &#8211; TEMPERATURE CHAMBER<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No. Manufacturer \/ Model Calibration Expired Date<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>THERMOTRON Model F-35 31\/10\/2007<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">TEST PROCEDURE<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">EXCLUSIONS FROM THE TEST METHOD<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">HIGH TEMPERATURE TEST PROCEDURE DESCRIPTION<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Period 16 Hours<br>Temperature +105\u00b0C<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">TEST PERFORMANCE<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Functional Test Performed by laboratory during and at the end of test.<br>Visual Test Performed by laboratory during and at the end of test.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">HID CONVERSION KIT LOCATED IN HIGH TEMPERATURE CHAMBER<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">. See pictures in paragraph 2.4.4<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">TEST RESULTS<br>In visual inspection at completion of the test, no external damage observed. Operational and visual tests have been conducted by the customer representatives during and at the end of the test.Pass O.K.<br>PRODUCT RESPONSE GRAPH<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Kensun PRODUCT RESPONSE GRAPH<br>RANDOM VIBRATION TEST<br>UNIT UNDER TEST OVERVIEW<br>Test Date 15,16\/5\/07<br>Customer Representative Shmuel Etinger<br>Customer KENSUN<br>Unit Name HID CONVERSION KIT INCLUDES: H01 ELECTRONIC BALLAST 0902 ELECTRONIC BALLAST<br>XENON LIGHTBULB<br>Item Quantity 6<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">TECHNICAL SOURCE<br>. BMW GROUP ELECTRICAL\/ELECTRONIC ASSEMBLIES IN MOTOR VEHICLES GENERAL INFORMATION. GS 95003-1 MARCH\/2000. SUPERSEDESRES 62.60013 PART 1, ISSUE 06.97.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">. INSTALLATION AREA B1 &#8211; ENGINE COMPARTMENT ATTACHED TO BODY<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">TEST INSTRUMENTATION<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Instrumentation Name Manufacturer \/ Model Calibration Expired Date<br>Electrodynamics Vibration System L.D.S \u2013 model: V-850 N.C.R<br>Vibration Control System D.P Model DP-550 30\/04\/2008<br>Control Accelerometer Endevco Model 224C. 30\/04\/2008<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">TEST PROCEDURE4.4.2. VIBRATION TEST PROCEDURE DESCRIPTION<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">EXCLUSIONS FROM THE TEST METHOD<br>Not applicable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">ENV_REPORT_RENDOM_PROCEDURE_ITEM_TITLE<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Item Position The test item was rigidly attached to vibration exciter<br>Vibration Axes 3 (X, Y, Z).<br>Frequency Range 5-200 Hz.<br>Vibration Time in Each Axis 3 hours<br>Vibration Level 1.28 g rms<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">TEST PERFORMANCE<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Functional Test Performed by laboratory during and at the end of test.<br>Visual Test Performed by laboratory during and at the end of test.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">HID CONVERSION KIT MOUNTED ON ELECTRODYNAMICS SHAKER<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">HID kit on the electrodynamics shaker<br>Xenon HID kit is on the electrodynamics shaker<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">HID Conversion kit on the electrodynamics shaker<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">TEST RESULTS<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In visual inspection at completion of the test, no external damage observed. Operational and visual tests have been conducted by the customer representatives during and at the end of the test. Pass O.K.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>LABORATORY DETAILSLab Name Elisra &#8211; Environmental Test Laboratory Address4234 Monterey Rd Unit A, San Jose, CA 95111 Tel.(408) 884-5885 E-Mailcustomer@cgxproducts.com CUSTOMER DETAILSCustomer Name KENSUNDOCUMENT CONTROLThis document is a controlled document.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-2746","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.cgxproducts.com\/index.php\/wp-json\/wp\/v2\/pages\/2746","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cgxproducts.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.cgxproducts.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.cgxproducts.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cgxproducts.com\/index.php\/wp-json\/wp\/v2\/comments?post=2746"}],"version-history":[{"count":1,"href":"https:\/\/www.cgxproducts.com\/index.php\/wp-json\/wp\/v2\/pages\/2746\/revisions"}],"predecessor-version":[{"id":2748,"href":"https:\/\/www.cgxproducts.com\/index.php\/wp-json\/wp\/v2\/pages\/2746\/revisions\/2748"}],"wp:attachment":[{"href":"https:\/\/www.cgxproducts.com\/index.php\/wp-json\/wp\/v2\/media?parent=2746"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}